Repair ... How to start it than to end, and how at the same time to save time? Today we share practical advice and tell, in what order should perform any repairs.

1. Define goals and objectives

Before repairs need to plan everything well

Before repairs need to plan everything well

At the beginning of the repair is the idea. Even before all the work, you need to consider the interior will be decorated in any style. What furniture will stand in the room. This will determine the correct location of wiring, switches.

And if you plan to repair the kitchen, you need to know what part of the space will be a kitchen apron. Where to mount for the headset, and provide air bleed.
Therefore, composed primarily serial plan ideas and all subsequent operations. This saves time and effort.

2. The preparatory process

Repair requires careful planning

Repair requires careful planning

In the draft stage, will take into account manymoment: cleaning the walls, the demolition (or construction) partitions, walls, replacement of windows, heating (if necessary), work on installing the air conditioner, the preparatory work for the installation of the floor, the dismantling of the old plumbing, pipe replacement in older buildings. But before we proceed to plaster works need to think carefully about where wiring will be installed.

3. Check the void and provide for trash removal

The new apartments is necessary to tap the wall,they may be void, and the plaster may crumble with time. And be sure to provide garbage collection. It is better to pre-book a special machine.

It is necessary to check the emptiness before treatment walls

It is necessary to check the emptiness before treatment walls

4. Installation of floor

After all the preliminary work, fitplywood, parquet, is casting, in general, are the preparatory work for the installation of the floor. Before you paint the walls or wallpaper glue, should be completed all preparatory work for laying the floor.

Installation of floor

Installation of floor

5. Align the wall

When aligning the walls necessarily needed to calculate how much material is required for all works. Count should be with a margin to work did not stop at the most inopportune moment.
You also need to take into account the time for drying. In some cases, when a thick layer of the wall of the solution may be dry for a long time (about a month). There are options in older homes where it is impossible to align the walls with a solution, then the required good fixtures and drywall.

The process of alignment of the walls

The process of alignment of the walls

6. Stretch ceilings

Sometimes there are issues with the installation of a tensionceiling, at what stage do it (after wallpapering, painting the walls). This process is considered to finishing, there is already at the finish line after all the work and the application of different types of coatings on the walls.

Mounting tension ceilings

Mounting tension ceilings

7. Finishing work

At the final stage is laying the floor, the doors are set, sockets, switches, thresholds and baseboards, installed plumbing.

The final stage of repair

The final stage of repair

8. Installation of doors

Often there are questions when installedDoor: after final flooring or less. To save time, do it better after the floor installation. Currently, this process relates to the finishing. Thus, the door will be prevented mechanical damage and contamination.

Sex after laying can go up a little, andit will be necessary to calculate the distance, in the event that the door will be installed before the floor installation. Therefore, experts recommend installing doors after the final works on the floor flooring.

Mount Door best sex after installation

Mount Door best sex after installation

9. The best time to repair

To all materials are well settled down in the interior, repair is better to spend it in the warmer months.

Summer is the perfect time for repairs

Summer is the perfect time for repairs

10. Everything is in order!

In summary, the repair can take place approximately in the following order:
• Please do the work related to electrical wiring.
• Next on the list are air-conditioning and heating systems.
• After the prepared subfloor.
• Are the dismantling of the windows.
• Prepare the walls and ceiling.
• Then their color (Wallpapers).
• Finish flooring, installation of doors, thresholds and baseboards.
• The final touch - the suspended ceiling.

Ready interior renovated

Ready interior renovated

Transform your interior and you can not repair. How to do it? We have prepared an overview of 20 stunning ideas for the modernization of the house a large family.